Busselton-Margaret River Regional Airport

Airside construction reached practical completion in March 2018. The runway has been lengthened, widened and strengthened to 2520m long (take off distance available) x 45m wide to initially facilitate narrow bodied aircraft such as Airbus A320 and Boeing 737, with the capacity to handle larger aircraft up to Airbus A330 in the future if required. Four new apron parking bays and connecting stub taxiways, a new General Aviation Precinct, along with lighting and two new helipads completes the airside upgrade. The new Jet Fuel facility has also been completed and is operational.